Coming up, some suggested solutions for construction zone accommodation for walkers and bicyclists, but first, the relevant signs and markings. These are MUTCD (Manual for Uniform Traffic Control Devices) compliant signs, which are always what should be used, not the hand-made and/or non-compliant signs that are sometimes used.

Note: I have modified the presentation of signs here, using two slideshows: Temporary Traffic Control (TTC) signs M (orange), and regulatory signs R (white). MUTCD R9-10 is not a favored sign because it gives no indication about what the most direct route for a walker is.

  • MUTCD M4-9a left sign
  • MUTCD M4-9c left sign
  • MUTCD M4-9c right sign
  • MUTCD R9-10 sign
  • MUTCD R9-9 sign

The no pedestrians sign, MUTCD R9-3a, is intended for permanent closures of crosswalks, not temporary closures of sidewalks, and so should not be used for construction zones.

MUTCD R9-3a sign: no pedestrian crossing

In the MUTCD, 154 pages are dedicated to Temporary Traffic Control Devices, almost all of which treat roadways as though walkers and bicyclists did not exist, but there are four pages and two diagrams which do show accommodation. For those unfamiliar with the MUTCD, the word shall means there is no choice, it must be done. So every construction zone that does not follow these is a violation of the law. The most important text is below, and the two diagrams follow.

“Standard:

  1. When crosswalks or other pedestrian facilities are closed or relocated, temporary facilities shall be detectable and shall include accessibility features consistent with the features present in the existing pedestrian facility.

Standard:

  1. When crosswalks or other pedestrian facilities are closed or relocated, temporary facilities shall be detectable and shall include accessibility features consistent with the features present in the existing pedestrian facility.
  2. Curb parking shall be prohibited for at least 50 feet in advance of the midblock crosswalk.”
MUTCD Figure 6H-29: sidewalk detour or diversion
MUTCD 6H-29: crosswalk closures and pedestrian detours

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s