SacATC meeting 2025-01-16 report

SacATC (City of Sacramento Active Transportation Commission) met Thursday, January 16, 2025.

The agenda included:

3. Selection of Chair and Vice Chair for Calendar Year 2025: Arlete Hodel was re-elected as Chair, and Isaac Gonzalez was re-elected as Vice Chair. Juanluis Licea-Cruz joined the commission as seat K youth representative, a high school student at West Campus joined the comission. David Moore was appointed to the Seat J. Ali Doerr-Westbrook has completed her term on the commission.

4. Caltrans American River Bridge Rehabilitation Project: The presentation by Caltrans staff was frustrating. A number of questions about details of the bike path being added as part of the freeway rehabilitation (widening) project went unanswered. Commission concerns were that there are a limited number of connections from the new path to existing bikeways, and that Caltrans has demonstrated an inability to maintain bike paths by the horrible condition of the Causeway path. The Caltrans staff claimed that some other agency would be responsible for maintaining the path, but seemed unclear about what agency. Federal law requires that the host agency is responsible for maintenance of multi-use paths in perpetuity, but Caltrans has rarely complied with that requirement. Completion of the entire project is December 2026, but it is unknown whether the path will be available before then. I hadn’t realized, but this path was part of a lawsuit settlement over widening of the freeway; it was not a project initiated by or desired by Caltrans.

5. Alternative Recommendation: Truxel Bridge Concept and Feasibility Study: See the STAR blog post for this topic, which includes all the agenda document parts. The commission voted for recommendation 3, “reject the Truxel Bridge Concept and Feasibility Study and instead recommend that the City Council direct staff to evaluate and study a Truxel Bridge alternative without personal motor vehicles.’ It was clear from the large number of in-person comments and eComments, as well as commissioner comments, that the city commitment to a multi-modal bridge with private motor vehicles is unacceptable.

My comments added two details: 1) SacRT board has never approved the city concept, though discussions at the staff level indicate that it might. The approved SacRT project is a transit/walking/bicycling only bridge. 2) The light rail to the airport Green Line might never be completed due to very high cost and uncertain ridership. If bus rapid transit (BRT) is implemented instead, the benefits of a direct bridge route are not clear. The current bus Route 11 jogs to the freeway, and is not signficiantly delayed by that. This BRT is not part of the current regional plans because it was assumed that light rail would be implemented, but it is quite possible that it might be added to the high capacity bus network plans.

It is assumed that the city study will proceed until the city council makes a decision on the SacATC recommentation.

6. Streets for People: Neighborhood Connections Draft Final Plan: staff report and Neighborhood Connections Plan: There was strong community and commission support for the plan, and it will be forwarded to council, probably next month. The toolbox part of the plan is outstanding. Nearly all of the 13 treatments in toolbox can be implemented as quick-build projects with low-cost materials, and eventually replaced by hardened infrastructure. Community and commission comments addressed the lack of likely funding for implementation, but it is hoped that the city will allocate some funds to the project, particularly now that the primary resister Howard Chan is no longer city managert.

For ‘not on the agenda’, I commented on the much delayed maintenance (sweeping) of the separated bikeways in the central city. The bikeways became nearly impassible during leaf season, except where they were cleared by landscaping services supplied by adjacent property owners, which is not their responsibility, but is appreciated.

Commissioners requested an update on the staff effort to inform council about what quick-build means. and this topic may also come back to the commission.

Traffic Diverter / Street Closure page from Streets for People Neighborhood Connections
Traffic Diverter / Street Closure page from Streets for People Neighborhood Connections

SacATC meeting 2025-01-16

SacATC (City of Sacramento Active Transportation Commission) will meet this Thursday, starting 5:30 PM, in city council chambers at 915 I Street, Sacramento. Comments may be made in person or via eComment ahead of time. Note that there are two commission meetings scheduled at the same time, so it is possible that this meeting will be in another location in city hall.

The agenda includes:

3. Selection of Chair and Vice Chair for Calendar Year 2025

4. Caltrans American River Bridge Rehabilitation Project: This project includes the addition of a shared use path (walking and bicycling) to the State Route 51 (Capitol City Freeway) bridge over the American River.

5. Alternative Recommendation: Truxel Bridge Concept and Feasibility Study: See the STAR blog post for this topic, which includes all the agenda document parts.

6. Streets for People: Neighborhood Connections Draft Final Plan: staff report and Neighborhood Connections Plan

The Neighborhood Connections Plan is largely unchanged from the 2024-10 draft. As such, I support it. It is important to remember that this plan only addresses residential and minor collector streets, which are important for encouraging walking and bicycling, but rarely are the location of fatalities and severe injuries. Those occur on major collector and arterial roadways, which are the subject of a separate Streets for People document, coming sometime later this year.

On page 19 the following info from the last round of public outreach is added:


PHASE THREE: PUBLIC DRAFT PLAN

  • Project Funding and Prioritization: How the plan will be moved forward into implementation, prioritization, and funding was a common theme. Community members requested clarification on the next steps for project implementation.
  • Speeding Implementation: Some workshop participants called for faster implementation of the recommended network via “quick build” projects.
  • Equity Considerations: Community members asked how equity would be considered for implementation, particularly where fewer active transportation facilities currently exists.
  • Youth Safety: School area improvements and other projects focused on addressing youth transportation needs was a theme in the virtual workshops.

The ‘Funding and Ways to Get the Network Built’ (page 123) is unfortunately unchanged. The city still does not identify even the possibility of using general funds for implementing this plan.

Truxel Bridge Community Open House, November 13

The City of Sacramento is holding a community open house on the Truxel Bridge project, on Wednesday, November 13, 5:30 – 7:00 PM. The event will be at SMUD Museum of Science and Curiosity (MOSAC), 400 Jibboom St, Sacramento, CA 95811. There is an Eventbrite registration, though registration is not required.

Truxel Bridge was originally proposed as a light rail and walking/bicycling bridge across the American River, part of the Green Line (light rail) to the Airport Project. Though it is unlikely light rail will ever go to the airport, it is possible that it will go to south and north Natomas, though the two council members from north and south Natomas don’t want to wait for light rail and would like to see bus rapid transit (BRT), sooner rather than later. The American River Parkway Plan, adopted by the county and the state, recognizes a transit bridge across the river though does not specify the location. The plan very specifically prohibits a private motor vehicle bridge.

The city, however, wants an all-modes bridge, including private motor vehicles. The addition of motor vehicles to the bridge would require a significantly wider bridge, and significantly more impact on the natural environment of the American River Parkway. The city is willing to pay for part of the bridge, but apparently expects SacRT to pay for much of it. The city is claiming the bridge will reduce VMT (vehicle miles traveled) and therefore GHG emissions, by shortening the drive from Natomas to downtown by a small distance, but has offered absolutely no proof for this claim. New motor vehicle capacity always induces more VMT. The city has also claimed that the selected crossing, from Sequoia Pacific Blvd to Truxel Road, is the best or only viable crossing, and has larded on all sorts of not-required improvements that would argue against using the existing river crossing at Highway 160. It is recognized that the Highway 160 bridges are substandard and will need to be replaced, but the city would rather fund a new bridge than fix the old. City staff has also claimed that since this project was approved by city council in 2014, only the exact alignment is under discussion. BS.

Sacramento Transit Advocates and Riders (STAR) has a number of posts on the Truxel Bridge project, category Truxel Bridge.

I hope that you will attend this meeting and speak up for the original concept, which is a transit/walking/bicycling bridge.

SacATC February 15, includes Truxel Bridge

The monthly meeting of the Sacramento Active Transportation Commission (SacATC) will be this Thursday, February 15, 2024, starting at 5:30 PM in the city council chambers. The agenda includes five items. You can comment on these items, or on topics not on the agenda, ahead of time via eComment, or in person at the meeting. I encourage people to attend these commission meetings. There are usually very few members of the public in attendance, which means that your voice is important. Though eComments are valuable, in-person comments carry a lot more weight. The city’s planning staff is usually progressive and innovative, but Public Works in general is not, so it is important the citizens show up to push for progressive and innovative projects and policies. With some new appointments to the commission, and support of the public, the commission itself has been much more progressive than in past years.

Agenda item 3 is a presentation on the Truxel Bridge Concept and Feasibility Study. The Truxel crossing of the American River was originally proposed and approved by SacRT and the county as a transit-walking-bicycling bridge, carrying light rail from downtown to Natomas. The city is now proposing a motor vehicle-transit-walking-bicycling bridge. They are claiming that the bridge would reduce vehicle miles traveled (VMT) through the provision of alternative modes, and a shorter trip between downtown and Natomas, but has not presented data to justify this claim. New roadway capacity induces more motor vehicle trips, a well-established fact, so to claim otherwise requires proof. Walking and bicycling would be unlikely to be the major component of bridge users. Transit availability could reduce motor vehicle trips, but the Green Line to the Airport is probably decades away, and anything short of service to North Natomas would be unlikely to replace many car trips.

The city intends to go full speed ahead (pun intended) with the bridge, based on a 2013 city council approval, seeking public input only on the southern approach to the bridge and the bridge cross-section. Since 2013, the city has declared a climate emergency, the Mayors Commission on Climate Change goal is to achieve Carbon Zero by reducing VMT, the soon-to-be-adopted General Plan 2040 and Climate Action and Adaptation Plan aim for reducing VMT rather than increasing it, and SB 745 required VMT impacts as the primary criteria for judging projects. Most importantly, public awareness of the risk of motor vehicle induced climate change has emerged and strengthened.