Sac permanently closes sidewalk

Note: updated 2020-03-28 to correct lane descriptions and add a photo of the lane shift.

On the south side of I Street, between 15th Street and 16th Street, the city has permanently closed the sidewalk. This was to construct a loading dock for Memorial Auditorium. I had noticed the construction going on there, the first phase of the city’s project for the convention center and community center theater, and just assumed things would be returned to normal when construction was complete. How wrong I was. I was flabbergasted when I saw this. The loading dock sticks quite a ways into what used to be the public right of way, erasing the sidewalk and two parking lanes (the general purpose lanes were shifted to the right). The loading dock is concrete, intended to be there forever. See the photos below.

If the loading area was really than important, and could not be provided anywhere else, the city could have set things up for easy temporary closure of some of the street so as to allow loading when needed. They did not, they made it permanent.

I have walked by here, on the sidewalk, when events were going on at the Memorial Auditorium and there were a lot of walkers using this sidewalk. I imagine for a lot of other uses as well.

Also note that the ‘ bike lane’ stripe does not meet standards for a bike lane because it is immediately adjacent to a hard barrier and fence, so requires shy distance not provided. So that means when there are eventually bike lanes on I Street, this will be a gap, permanently.

What the fuck were you thinking, City of Sacramento?

photo: I Street, south side, east of 15th Street
I Street, south side, east of 15th Street
photo: I Street, south side, east of 15th Street
I Street, south side, east of 15th Street
photo: I Street, south side, west of 16th Street
I Street, south side, west of 16th Street
photo: I Street, south side, west of 16th Street
I Street, south side, west of 16th Street
I Street westbound, lanes shifted right