The Broadway Complete Streets project is underway, with new corners installed at many locations, some of them curb extensions (bulb-outs) to shorten crossing distance for walkers. Though I’m reluctant to criticize a project that is underway, I just can’t remain quiet. I have been spending a lot of time on Broadway because I’m interested in the street and its businesses, and always want to see how the city is shifting away from its former ‘cars first’ policy and design. Some of what I’m seeing is great, but I’m also seeing a lot that makes me very concerned, and disappointed. The city could have done much better, but decided not to.

The project was designed from the inside out, first motor vehicle space for turn lanes, travel lanes, and parking lanes, then bicycle lanes. The result clearly shows this priority. But streets should be designed from the outside in, taking care first of the needs of people walking. The city did not do this.
The Broadway Complete Streets webpage says “The project location is the two-mile Broadway corridor between 3rd Street and 29th Street, south of downtown Sacramento, California. It anchors multi-modal transportation connections and improves access for all modes through introduction of a four lane to three lane road diet, new buffered bicycle lanes, new marked pedestrian crossings and refuge islands, and multi-modal improvements at two intersections”, and “The project is designed to calm traffic, improve safety, and make the street more inviting for travel on foot and by bicycle.” Notice that sidewalks are not specifically mentioned.
The pedestrian selection criteria from the 2016 Broadway Complete Streets Final Recommendations shows the following table. The third row (of eight) is ‘pedestrian space’, and it talks about space at ‘sidewalk enhancement locations’. But the document never indicates where these location are, nor mentions them again.

The plan cites as a critical issue: “Sidewalk obstructions or narrow sidewalks”. It also says, under transit improvement, not sidewalks: “Over time, opportunities for sidewalk expansion can be explored on blocks as appropriate. The Broadway Complete Streets Plan designs allow for conversion of the parking lane to an expanded sidewalk to create space for better bus amenities, landscaping, sidewalk dining, and other urban design elements.” What I think that means is that concrete for sidewalks and curbs will be poured now, and we’ll think about doing better later. The document refers to information about sidewalk widths in the existing conditions technical appendix, but that document has not been made available to the public.
The city’s Street Design Standards for sidewalks is five feet, or six feet for arterials. Broadway is a ‘minor arterial’ from 5th Street to 10th Street, and a ‘principal arterial’ from 10th Street to 29th Street, so the sidewalk width would be six feet. Existing sidewalks along Broadway vary greatly in width, from expansive, to wide sidewalks typical of the central city, to very narrow sidewalks. Of course there are locations where the sidewalk has been narrowed to accommodate tree growth, but the city is installing NEW sidewalk along Broadway that is less than city standards. The PROWAG requirements are four feet, but there are NEW sidewalks that are as little as 34 inches. The city’s project engineer has claimed that PROWAG does not need to be followed for this project because PROWAG is not enforceable yet. Seems strange to claim that because enforcement action can’t be taken, federally promulgated regulations don’t need to be followed.
The project is installing better crossings for walkers at several locations, but has pretty much ignored the needs of people walking ALONG the street. The design documents do not show sidewalk widths anywhere, though turn lane, traffic lane, parking lane, and bike lanes are clearly labeled with widths. It is as though the project design did not even think about sidewalks.
The city must correct its too-narrow sidewalks along Broadway. Where a parking lane is adjacent to these too narrow sections, the parking lane must be converted to sidewalk so as too provide the legally required width, or better yet, at least eight feet. If this is to be a complete street, and a walking-friendly and business-friendly street, then eight feet should be the minimum. If a parking lane is not available to convert, then the city must purchase property or easements to widen the sidewalks to the minimum five feet required by its own standards.