9th St update

Things have changed again. The construction zone on the east side of 9th Street between K Street and L Street has changed again. The east parking lane and east travel lane are now dedicated to the construction project, the general purpose lane has been shifted right into the west parking lane, and the combined pedestrian/bicyclist bypass is now in what was the right hand general purpose lane.

One the plus side, detectable strips have been added to the left side of the bypass, which are required to provide protection from trip and crash hazards presented by the fence bases. Photo below.

detectable strips along bypass on 9th St

The entrance to the bypass is still awkward, too narrow and poorly signed. There are still corrections to be made.

entrance to pedestrian/bicyclist bypass on 9th St

Previous posts: 9th Street update, 9th St fixed, sort of, and 9th St blocked by construction.

9th St blocked by construction

Thank you, Ali Doerr Westbrook, for flagging the latest violation of walker and bicyclist accommodation on a construction project in Sacramento.

The east side of 9th St between L St and the alley is blocked by a construction project. Both the sidewalk and bike lane are blocked. There is no advance signing at 9th and K for southbound walkers and bicyclists, as required by ADA. There is no signing on the construction fencing, as required by ADA. Construction fencing is not an acceptable detectable warning, as required by ADA. Note that this construction project, the conversion of Capitol Park Hotel into supportive housing, is a city project, so not only is the city responsible for a traffic plan that accommodates walkers and bicyclists, but field checking that the plan is being followed, and enforcing it when it is not.

9th St at K St, no advance warning of closure ahead for walkers or bicyclists

This blockage would in itself be bad, but it is made worse by the blockage of the sidewalk on the west side of 9th St, between K and the alley. This private project is also not properly signed and barricaded. Between these two projects, there is NO walker access on 9th St between K St and L St. None. None. None. Of course one could cross at the alley between one side and the other, but then the city conveniently has a walker-hostile code that crossing streets at alleys is illegal. Got the bases covered, Sacramento!

Though the most egregious, this incident is just the latest in a series of offences in the central city. I have posted on some of these here (tag: construction zone), and on Twitter. I’ve also reported a large number of them to the city’s 311 app. Of these 311 reports, about half are closed without anything being done. Making the same report multiple times increases the likelihood, but doesn’t guarantee it.

The worst of the violations are on city projects. The renewal of Memorial Auditorium had issues. Though now finished, it resulted in the permanent closure of the sidewalk on the south side of I Street. The next worse offense is the ongoing city project called 3C, the convention center and community auditorium construction project. Though some of the issues have been resolved here, several remain, particularly on the 15th St side. And this Capitol Park Hotel project is also a city project. There have been other city project problems, but I don’t have time today to go back through my records and photos to identify all of them.

In response to the concerns from myself and many others, the city had said that it would come up with a construction accommodation policy. After a year, nothing has happened. The city, at least the part of the city responsible for construction zone traffic plans, just does not care. Walkers and bicyclists are routinely ignored or actively discriminated against, in favor of motor vehicle drivers. The city is in violation of its ADA consent decree in allowing these issues to occur and to continue.